Plant infrastructure
INFRASTRUCTURE
25 tons per hour
Boiler department with Italian equipment, with a steam capacity
25 000 kW
Electric substation with two transformers with a capacity of 25,000 kW each
350 m³ per hour
Sewage pumping station with wastewater transmission capacity
600W per hour
Local treatment facilities with wastewater treatment capacity
2,000 m³ per hour
Air compressor station with air production capacity of 1,000 m³ per hour and processed air
Own transport flee
Boiler department
Sewage pumping station
Air compressor station
Local treatment facilities
Own transport flee
Electric substation